How to install the flip up ladder for mezzanine

Release Time:

2023-02-18


Flip up ladder is installed on the concrete wall to access the mezzanine areas. It can be extended from top to down when in use and can be retracted when not in use. It is easy to install and operate.

 

1. Surface cleaning :

 

a) Clean the concrete surface where the ladder has to be installed to be free from

debris and other foreign particles.

b) Make sure the concrete surface is leveled before installation.

2. Drilling:-

a) Position the ladder by lifting to the wall where it has to installed and mark the holes

for drilling location.

b) Drill holes on the concrete block in line with the hole marking location.

c) Clean the holes free from debris and other foreign particles after the drilling

procedure using an air gun or any similar equipment.

d) After marking place the ladder in a safe ground position.

3. Lifting of Ladder:-

a) Lift the ladder up by using two or three man power.

b) Align the bolt hole on the wall with the hole of ladder frame.

4. Fixing the ladder:-

a) Make sure the ladder is in closed position on the concrete block while fastening the

bolts.

5. Fastening:-

a) Ensure the bolts are fastened tightly so that the ladder remains sturdy.

b) Use the pull down stick to pull the ladder and access the ladder.